Today’s ecosystem of industrial automation is characterised by many media disruptions during the processing and transfer of documentation. It is essential to resolve these issues within the development process for machines and plant systems – via targeted collaboration among all stakeholders and systems. Data created in the engineering process must be shared with everyone involved in the process. The ideal goal: machine builders and system integrators, control cabinet manufacturers, component manufacturers and also the machine or plant system operator all work networked together.

Operators of production facilities, machine builders and system integrators, control cabinet manufacturers and component manufacturers all have one thing in common: they all work together along the value chain, from the planning through to operating a finished machine or plant system – and continuously exchange information in the process.

The ecosystem of industrial automation

What does this process – the collaboration among the various process participants – look like today? In the planning phase, the characteristics of the desired machine or plant system are described. If the company has particular supplier specifications, these are also detailed and then passed on to the operator, who takes the specifications into account when designing the machine or system. The planning phase is followed by the preplanning process. Additional information such as devices, release lists from Excel, specifications in Word or preplanning tools such as EPLAN Preplanning are taken into account and, in turn, are used by the basic engineering designers to prepare a quote, for instance. In the case of more complex production lines, this is traditionally taken care of by a system integrator, who is also responsible for the detailed engineering and for generating electrical and fluid-power schematics.

Data is enriched in the EPLAN Project

The project created with systems of the EPLAN Platform – EPLAN Electric P8 or EPLAN Fluid, for example – is now transferred to the control cabinet manufacturer. This manufacturer creates the virtual prototype of the switchgear system in the form of a 3D assembly of the control cabinet using EPLAN Pro Panel. The control cabinet is then built, approved and commissioned by the operator. With the delivery of the switchgear system, the control cabinet manufacturer processes are complete. The company hands over the EPLAN Project, which has been enriched with data, back to the machine builder or system integrator, who then commissions the machine or plant system based on the final project data. The project is then made available to the operator, who can access the current documentation, for instance using EPLAN eVIEW, in the event that servicing or maintenance becomes necessary, and who can digitally document any changes using the redlining function as needed.

This process describes the daily work in this ecosystem of industrial automation. The challenge, however, is that all the data for an automation project is created and added at various stations along the value chain. Often, all the project participants are working with partially inconsistent data, which ends up making the process even more time consuming and error prone. For instance, the drive power of a motor is changed at some later point in a project, but this change isn’t taken into account when the machine or plant system is commissioned. As a result, the documentation is not up to date.

A “data container” as the central source of information

This is where EPLAN comes in: the systems of the upcoming EPLAN Platform 2022, in combination with the new EPLAN eMANAGE cloud service, network together machine builders and system integrators, control cabinet manufacturers, component manufacturers and the operators of machines or plant systems. EPLAN CEO Sebastian Seitz explains: “We connect companies with their clients and suppliers via the cloud, for easy and secure data sharing. The EPLAN Project as the central, digital model of an automation solution supplies all processes with the necessary data. What we’re talking about is a sort of ‘data container’ that is fed from the systems of the EPLAN Platform. This generates added value in the digitised collaboration of all participants – through secure data transfer and central access to the EPLAN Project.” A new feature includes the connection to the cloud via EPLAN ePULSE, which also significantly facilitates mobile working in design and engineering.

Cross-project collaboration via the cloud

Using the new EPLAN eMANAGE, projects can easily be uploaded to the cloud and managed and shared from there. More specifically, this brings together the worlds of on-premises software and the cloud. Clear access rights via role management ensure data security and provide flexibility for accessing projects. Users of EPLAN Electric P8 and EPLAN Pro Panel can conveniently upload their projects to the cloud and transfer them to the EPLAN Platform for further processing. This is accomplished without the time-consuming sending of project data via email or using an FTP server. And the centralised, clear availability in the cloud also enables all project participants to search quickly for specific content. With EPLAN eVIEW, all the changes in a project are centrally available. The advantages are obvious: project documentation is always up to date – along the entire product life cycle and into operation and service scenarios. An important component of this method of working is device data, which is provided on the EPLAN Data Portal. Seitz says, “What matters here is the quality and depth of the data, something we are intensively advancing with the Data Standard.” Comprehensive, integrated and end-to-end digital data serves as a project accelerator. And don’t forget, the data are consistent and the data transfer is secure.

High-quality digital device data is a key factor in:

  •    –   Processing orders in shop floor management and deriving production orders.
  •    –   Controlling automated machine fleets (Rittal Automation Systems).
  •    –   Providing information to partially automated workstations (for instance, simplifying wiring processes with EPLAN Smart Wiring).

Seitz continues: “With these optimised processes and increased efficiency, companies can optimise their machine and plant system design processes and sustainably increase the availability of their machines and plant systems. Collaboration among all participants ultimately increases the quality of the data and thus the added value.”

Important_Links_Bar.jpg

https://www.eplanusa.com/company/news/collaboration-in-the-ecosystem-what-matters/

 

Related Articles

Network Infrastructure Featured Product Spotlight

PBUS 14 Panduit logo 400

This webinar presented by Beth Lessard and Keith Cordero will be highlighting three Panduit solutions that will optimize network equipment and cabling to ensure that your spaces are efficiently and properly managed to support ever-evolving business needs of today and beyond. Products that will be featured include PanZone TrueEdge Wall Mount Enclsoure, Cable Managers, and Adjustable Depth 4-Post Rack.

REGISTER HERE


Editor’s Pick: Featured Product News

Siemens: SIMOVAC Non-Arc-Resistant and SIMOVAC-AR Arc-Resistant Motor Controllers

The Siemens SIMOVAC medium-voltage non-arc-resistant and SIMOVAC-AR arc-resistant controllers have a modular design incorporating up to two 12SVC400 (400 A) controllers, housed in a freestanding sheet steel enclosure. Each controller is UL 347 class E2, equipped with three current-limiting fuses, a non-load-break isolating switch, and a fixed-mounted vacuum contactor (plug-in type optional for 12SVC400). The enclosure is designed for front access, allowing the equipment to be located with the rear of the equipment close to a non-combustible wall.

Read More


Sponsored Content
Electrify Your Enterprise

Power is vital to production, and well-designed control cabinets are key. Allied Electronics & Automation offers a comprehensive collection of control cabinet solutions including PLCs, HMIs, contactors, miniature circuit breakers, terminal block connectors, DIN-rail power supplies, pushbutton switches, motor starters, overloads, power relays, industrial Ethernet switches and AC drives engineered to keep your operations running safely, reliably and efficiently.

Learn more HERE.


Products for Panel Builders

  • OKW: IK/IP-Rated SOLID-BOX for Industrial Touch Screen and Display Electronics

    OKW: IK/IP-Rated SOLID-BOX for Industrial Touch Screen and Display Electronics

    More electronics designers are specifying OKW’s tough SOLID-BOX to safeguard sensitive touch screens, control panels and displays in harsh industrial environments. IK 08 (impact) and IP 66/IP 67 (ingress) protection make SOLID-BOX ideal for plant and machine construction, HVAC, IoT/IIoT, Smart Factory/Industry 4.0, gateways, data loggers, ICT, electrical installations, measurement/control, agriculture/farming, sensor systems and safety… Read More…

  • LOVATO Electric: New Double Contact Elements and Auto-Monitoring Contact Element

    LOVATO Electric: New Double Contact Elements and Auto-Monitoring Contact Element

    LOVATO Electric enriches the range of pushbutton and selectors Platinum series with the new double contact elements and auto-monitoring contact element. The double contact elements provide the flexibility of two contacts (1NO+1NC, 2NO or 2NC) within the same dimensions as a single contact (LPXC10 or LPXC01). The new auto–monitoring contact is replacing the previous auto-monitoring contact versions (LPXC01SM and LPXC02SM)… Read More…